Utility crew dispatch & work management

A water main just broke under Elgin Street.

A main break under Elgin, and your only confined-space crew is halfway through a three-day valve replacement. The plan didn’t break because your control room misjudged it — it broke because every work order carries a web of dependencies: a certification, a vac truck to mobilize, a permit window, a multi-day job that can’t lose its thread. Most software ignores that web and drops it on a dispatcher at 6:58 a.m. Crisphive carries it instead, so your people don’t have to.

Who it's forMunicipal and investor-owned utilities running water, electric, and civil crews — from a single ops centre to a whole regionWhat it protectsCrew certifications, equipment mobilization, permit and locate windows, and multi-day jobs
Get started free

This demo replays a real kind of morning: one emergency lands, and every job finds a new slot without breaking a promise. See how it works ↓

Granite Utility Services — Thursday crewsPLAN CONFIRMED
Crew ACONF-SPACE · HYD
🚨 EMERGENCY · Main break, Elgin StVac truck mobHydrant flush routeValve exercise programChamber inspection
Crew BHYD-2
Valve replacement · Day 2/3Curb stop repairsLocates support
Crew CELEC-HV
Substation PMStreetlight circuitFeeder inspection
Crew DCIVIL
Sidewalk formsTrench reinstatementCatch basin repairHydrant flush ↷

Jobs moved: 0SLAs broken: 0Radio calls: 0

Every field service day is a dependency graph. Most software pretends it isn't — and hands the graph to a dispatcher to solve in their head, under pressure, forty times a day. We think the schedule should carry that weight, not your people. That's the whole company.

— Why Crisphive exists

How it fits your day

When the day changes, the schedule keeps up.

Crisphive is the layer that carries your whole day’s dependencies — every work order, permit window, certification, and crew constraint. So when something breaks, the plan repairs itself instead of landing on one person in the control room at the worst possible moment.

The day changes

The break arrives however you hear about it first — a SCADA alarm, a 311 report, a phone call from a crew on site. It lands as a top-priority emergency, ahead of the routine work.

The schedule recomputes

The schedule re-plans your crews against every hard rule — certifications, equipment mobilization, permit windows, multi-day continuity — and hands back a new plan plus a backup.

Your team is notified

You confirm once. Your work orders update, your crews get re-routed, and your residents are notified — nothing else for your team to chase.

You never rebuild the day by hand. The schedule recomputes around the disruption, keeps every promise it can, and shows you exactly what moved before anything goes out. Confirming the new plan takes one click.

The rules of your day

Hard rules, not suggestions.

A schedule that ignores these rules isn’t a schedule — it’s a guess, and a crew standing in a trench pays for the guess. Every plan Crisphive hands you respects all of them. No exceptions, no “hope the crew makes it.”

certification

Crew certification

A main break needs confined-space and hydro tickets. The schedule only sends a crew who holds them — Crew A goes, not whoever’s closest.

logistics

Equipment mob & demob

The vac truck has to arrive before the crew can dig. Every mobilization and demobilization is planned with real transit time — you see it on the plan, and it’s never billed as work.

continuity

Multi-day job continuity

A three-day valve replacement can’t restart from zero every morning. The schedule keeps multi-day work intact, so an emergency never quietly unwinds two days of staged progress.

compliance

Permit & locates windows

Excavation permits and utility locates are only valid for a set window. The schedule plans inside them — a plan that has a crew digging without a live locate never comes back.

commitment

SLA escalation tiers

Regulatory and customer deadlines run on different clocks. Priorities escalate automatically, so a main break outranks a hydrant flush every time — and you can always show why.

travel

Site-to-site travel

Heavy crews don’t teleport between sites. Travel is planned leg by leg, so the plan you get is one your crews can actually drive.

Getting started

Up and running in three steps.

1

Add your crews and their tickets

Sign up and add your crews — their certifications (confined-space, hydro), their equipment, and their vehicles. These are the things every schedule has to respect.

2

Bring in your jobs and customers

Bring in the week’s work orders and the residents they serve — import them or run alongside the tools your ops centre already uses. Confirmed windows and commitments come with them.

3

Let the day run itself

From then on the schedule keeps itself. Emergencies slot in, affected jobs move, and your team and customers hear about it automatically — you just confirm.

⏱ Most teams are live within a week — no technical setup

Outcomes

What changes for you. What your customers feel.

You — running the business

Run work management that survives the main break.

  • Your control room stops rebuilding crew plans by hand. An hour of radio triage becomes one confirmation click.
  • Your maintenance program keeps moving. Multi-day jobs hold their thread and planned work slides instead of collapsing.
  • Every plan is a compliant plan. Permits and locates hold, so you’re never one step from a violation you didn’t see coming.
  • You can always show your work. When a regulator or a resident asks why a crew moved, the answer is right there in plain language.

Your residents

One emergency stops derailing everyone else.

  • Elgin Street gets its water back by mid-morning. The emergency is handled fast, without a scramble.
  • The valve replacement still finishes on day 3. One main break doesn’t quietly cost another neighborhood its scheduled work.
  • Planned work still shows up when promised. A bad morning in one place doesn’t blow the windows everywhere else.
  • People hear the truth, early. When a crew is re-routed, residents are told what’s happening instead of waiting on a silent street.

Running more than one branch?

Set the rules once — they hold across every crew and branch. The certification, mobilization, and permit logic you set up for one district carries to the next, so adding crews, yards, or a whole new region doesn’t multiply the chaos on your dispatcher’s desk. Growth stops meaning more people chasing more phone calls.

Why it holds up

Built for the days that go sideways.

Never billed

Re-planning is free

Re-planning is free and unlimited — no charge for a cascade, a recompute, or a re-read. Utility days are volatile by nature, so re-plan on every disruption without watching a bill climb.

Consistent

Dependable by design

Schedules come from a deterministic engine, not guesswork — the same situation always produces the same plan. AI helps explain the plan in plain language; it never decides who goes where.

Backup included

Always a plan B

Every urgent booking comes back with a recommended plan and a backup. If the customer declines the first window, the next-best option is already on the table.

What operators say

Utilities that keep planned work moving

18 crews · Water
A main break used to mean an hour of radio triage while a three-day valve job quietly lost its thread. Now the break lands, the vac truck and the confined-space crew resequence in seconds, and the multi-day work keeps its continuity. My dispatchers go home on time.

Fiona MacLeod

Control Room Supervisor · Cedar Valley Water

3 districts · Electric
Certifications and locate windows used to be tribal knowledge — one dispatcher retired and we were exposed overnight. Now they live in the schedule as hard rules. A new dispatcher ran a storm day in her second week and nothing fell through.

Andre Boucher

Operations Manager · Lakeshore Electric Co-op

Water & civil · Regional
When a regulator asks why a crew moved off a locate, I can replay the exact plan and point at the rule that drove it. That defensibility used to take days of email archaeology. Zero compliance findings this year.

Meera Nair

Director of Field Operations · Twin Rivers Utilities

FAQ

Questions from the field

How fast can crews re-plan after a main break?
The whole board re-plans in seconds — affected jobs, travel, and equipment moves all included. Your dispatcher sees the full list of what moved before anyone rolls.
Are certifications like confined space and HV enforced?
Yes — they’re hard rules, not preferences. A high-voltage job only lands on a certified crew with the right equipment, and the schedule won’t send anyone who isn’t qualified.
Can jobs span multiple days without losing continuity?
Yes. A dig that runs past the shift keeps its crew, its site, and its equipment from one day to the next, instead of being re-planned from scratch every morning.
Will it work with the systems our ops centre already uses?
Yes. Crisphive runs alongside — or inside — the work-management and mapping tools your crews already use, all under your own name. There’s no new software for your team to learn and no engineers needed.
Our ops centre isn’t a software shop — how do we get started?
Most utilities get Crisphive through the vendor they already work with, so it simply shows up in familiar software. On your own, setup is self-serve — and if you’d rather have help, our team gets you live with you.
What does re-planning cost during a storm, when everything moves hourly?
Nothing extra. Re-planning is free and unlimited — you only pay when a job gets scheduled, not when it moves — so re-running the whole board every hour of a storm never adds to the bill, and spending caps are on by default.

Your schedule should survive a bad morning.

Start free and watch a real utility week re-plan itself around the break — crews, equipment, and permits all still holding. It’s exactly what your ops centre would confirm on a bad Thursday.